Dark colour coverage

Written by Archer. Posted in Jobsite Journal

Brush finish

Published on October 03, 2011 with No Comments

Paint a flower shop in Martin Place, Sydney. The store is 13.5 meters long and 6 meters wide, with timber-built wall and with 4.2 meters height ceiling with both downlights and pendant lamps. Cost 8 labour days to get a fine finish. (Spray limited, all the jobs had to use brush or roller finish.

About Archer

Archer is a full time painting contractor, specialize in research paint product, review milestones of painting industry, deliver the most effective way of project and fine finish. " I do painting, deal with the issues and fix the problems with the best solution and resources, sometimes write them down as an education material"

Browse Archived Articles by

No Comments

There are currently no comments on Dark colour coverage. Perhaps you would like to add one of your own?

Leave a Comment